|
 |
|
 |
|
Log
Checker Project
Parts Listing
Parts Catalog |
|
9/1/2011-
Walnut Creek- Removed roof rack,
rails, and clearance lights.
Began overall sanding- roof,
hood, ds fenders
front and
rear, ps fenders-
front &
rear and
trunk lid. |
|
9/2/2011-
"Photoshopped" Auxiliary heater label.
Before
After Printed on label stock |
|
9/3/2011-
Cleaned
rust and
paint from auxiliary
heater housings, motor, fan and grille |
|
9/4/2011-
Sanded Auxiliary heater parts, primed,
top-coated and
applied
clear coat |
|
9/5/2011-
Applied label and assembled
unit. |
|
9/7/2011-
Bought paint and primed PS front door- used old primer (20 y.o.) will redo |
|
9/8/2011-
Bought new primer $$$ Yikes. Spent the entire day cleaning the layers of
dust, dirt and rust from the garage and putting away tools. Nice to
have things back in order. Dis-assembled DS front door. |
|
9/9/2011-
Began Sanding DS Door |
|
9/10/2011-
Disassembled spare front fender assemblies and began sanding paint and
grinding rust. |
|
9/12/2011-
Sanding Spare DS front fender |
|
9/13/2011-
Sanding Spare PS front fender |
|
9/14/2011-
Cut out inner fender mud shields |
|
9/15/2011-
More sanding of spare fenders |
|
9/16/2011-
Primed front outer fenders, sanded headlight bezel (1) |
|
9/18/2011-
Sanded and primed spare inner fenders. More bolt cleaning. |
|
9/19/2011-
Walnut Creek- more sanding on body in preparation for paint.
The dust falls like snow. |
|
9/20/2011-
Disassembled DS Front Door-Sanded |
|
9/26/2011-
Sanded PS Front door- incredibly difficult to remove the Imron paint from
1982. That must've been excellent paint back then, just somewhat
toxic. |
|
9/27/2011-
Walnut Creek- Grinding more old paint into powder (sanding)- rear inner
fenders and trunk lid. Pinole-Finally came up with a repair strategy for
Passenger Front Door. Cut out
first group of repair pieces
and mounted. |
|
9/28/2011-
Continued metal forming and
patch
fabrication on
PS Front Door. Brazed
all patches to door and did preliminary sanding.
corner
center
corner |
|
9/29/2011-
Fabricated last piece for
corner of PS Front door and brazed into place. |
|
9/30/2011-
Started Bondo work on PS Front Door. Cut out rusted areas on DS Front Door.
Cut and fitted patches. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |