3/2/2011- Cleaned and straightened Parking Light
Housings. Rec'd Camaro intake from good friend.
Cleaned windshield washer, Rainy day |
|
3/3/2011- Worked on PS Upper Control Arm-cleaned
down to bare metal, removed inner bushings and ball joint. Picked up
radiator Ordered side marker lights. |
|
3/4/2011- Finished
TS Housings and Upper PS Control Arm,
Prepared and painted intake and exhaust
manifolds. Used Lower Control Arm
(PS) arrived. |
|
3/5/2011- Cleaned and de-rusted Used Lower
Control Arm, Removed Bushings and ball joint-Primed |
|
3/6/2011- Painted PS Lower Control Arm, Cleaned Cast
Iron connector LCA |
|
3/8/2011- Installed LCA Bushings, Wire wheeled
cooling shroud-primed, cleaned and painted bumper supports |
|
3/9/2011- Began cleaning DS Upper Control Arm-
Painted fan shroud-ordered upper ball joints-58 T-Bird |
|
3/10/2011- Finished install upper control arm
bushings-pass. side, cleaned water pump pulleys, AIR pulley, Crankshaft
pulley-primed and painted, ordered coil springs, side markers, T/L gaskets |
|
3/11/2011 Packaged and sent out power brake
booster and front bumper for rebuilding/re-plating |
|
3/12/2011- Removed bushing from DS Lower Control
Arm, began de-rusting process. Removed Cast Iron connector LCA- Cleaned and
de-rusted. |
|
3/13/2011- Continue removing rust from LCA,
applied primer to LCA |
|
3/14/2011- Painted LCA with Chassis Black, Began
disassembly of PS Spindle and Brakes |
|
3/15/2011- Began
cleaning
of PS Frame, Installed Control
Arm Bushings PS Lower Control Arm, Installed new suspension bumper and cast
iron connector-complete |
|
3/16/2011- Finished painting UCA Driver's side.
Continued trying to disassemble PS Spindle. Grumble grumble. |
|
3/17/2011- Succeeded in
disassembling Spindle. Bought used manifold. This one has the egr
valve and heat-shields.
Cleaned,
de-rusted, primed and painted spindle
parts, R&R lower ball joint. |
|
3/18/2011- Assembled PS Spindle. Installed Lower
ball joints on control arms. |
|
3/21/2011- Disassembled, cleaned and painted DS
Spindle. R&R DS Lower Ball Joint, Painted DS Impact Absorber Bracket |
|
3/22/2011- Cleaned DS Front Frame and
cross-members |
|
3/23/2011- Cleaned Junkyard
Intake and Exhaust Manifolds, Heat Stove, EGR Hold down, Bellcrank, and
Choke Hsg. |
|
3/24/2011- Continued attempt to remove all rust
from exhaust manifold-slow going |
|
3/25/2011-
Primed manifolds, cleaned side marker
clips & primed, primed bellcrank, energy absorber support and EGR hold down |
|
3/26/2011-Painted
Exhaust Manifold & Heated Air
stove |
|
3/27/2011-Touched up exhaust manifold,
painted
intake manifold, painted energy absorber support (DS), Cleaned and
painted air horn extension |
|
3/28/2011- Second coat engine paint on intake manifold,
wire-wheeled rust on radiator support panel, primed and topcoated-incomplete-ran
out of underhood gray |
|
3/29/2011-
Assembled intake and exhaust manifolds,
installed new EGR valve and choke thermostat. Cleaned manifold bolts and
hardware. Painted and assembled calipers. Attempted repair on heat
shield-failed |
|
3/30/2011-
Primed and painted frame,
undercoated firewall, cleaned transmission,
removed side covers on engine and
rocker arm cover, prepped engine for paint,
removed pan bolts. Transferred old parts to new brake rotors |
|
3/31/2011-
Cleaned frame bolts, bought used AIR Pump and Diverter Valve |
|
|
|
 |