Index Links

Gus Says... Ray Quigley's Artwork  The Library A Letter from Gus

Illustration Galleries 

 

CONTACT US

HOME

SITE MAP

PROJECT

GUS BIO

AUTHOR

STORIES

New!

WORD Format

COMPLETE LIST

POCKETBOOKS

ARTWORK

COVER ART

HELPFUL HINTS

NEW STORY

by Dave Mantor

MECHANICS

MECHANIC'S CREED

BOY MECHANIC

GAS STATIONS

FEEDBACK

ORIGINAL SCANS

FINAL EXAM

 

 

LITTLE HOUSE PROJECT

 

February

January February March April May June July August September October November December

Log     Checker Project     Parts Listing      Parts Catalog

2/1/2011- Removed hood, lower splash panel, AIR pump, alternator, thermostat hsg, clearance lights, taillights, radiator hold-down

2/2/2011-Finished Headlight Assemblies, Cleaned Alternator, Cleaned Air stove/Paint, Cleaned Hood Latch

2/3/2011- Rebuilt Hood Lock, Safety Catch and spring plunger-Installed on Latch Housing, Rebuilt Alternator, Rebuilt License Plate Light, Finished Radiator Hold down

2/6/2011- Tail light housing, bumper guards, Turn signal housings to plater.

2/7/2011- Bead blasted air pump parts, t/s reflectors, old diverter valve and License bracket- won jump seat cushions (ebay), Finished Reverse Lights

2/8/2011- Removed both front fenders, radiator cradle, radiator, water pump, fan, heater valve, & starter

2/10/2011-Cleaned and rebuilt starter, installed new terminal kit in alternator, cleaned and painted water pump and thermostat housing, repainted license light & bracket, cleaned and painted carbon canister holder, cleaned canister

2/12/2011-Cleaned and painted AIR Pump pulley. Installed new diverter valve (Volvo), installed carbon canister bottom and filter

2/15/2011-(Before) Removed Upper and Lower Control Arms and Passenger side coil spring.  Removed front pulley and timing cover.

2/17/2011- Bead blasting continues- timing cover, all front pulleys. Order tail-light refinishing kit

2/20/2011- Bead Blasting fan. Cleaning A frames-problem with lower control arm PS-uh-oh

2/21/2011- Finished removal of all suspension components and bumper to frame brackets, removed manifolds and carb.

2/22/2011- Removed air injection manifold, master cylinder and power brake booster.  Cleaned firewall.

2/23/2011- Cleaned first set of A-frames with gasoline in preparation for the inaugural "soda blasting"

2/25/2011- Cleaned AIR manifold, began degreasing second set of A-frames (driver's side)

2/26/2011- First use of soda blaster-Cleaned control arms (before) (after), fan shroud (before) (after), radiator cradle (before) (after)  Damage to upper ball joint-passenger side

2/27/2011- Removed Header pipe, picked up re-plated parts (tail light housings, t/s housings, front bumper guards)-beautiful job!, Cleaned front spindle and caliper assemblies

2/28/2011- Had new header pipe made, ordered lower control arm from Arizona, suspension bumpers coming from PA, ordered brake parts, dropped off radiator for repair and cleaning. Ordered brake hoses